Tuesday, June 8, 2010

June 2010

Less than two months till move in day. There are lots of finishing touches on the inside of the bulding.

1) Data center communications are being installed.





2) Smart Board technology




3) Teller Line construction


4) Pre & Post carpet installation.


Tuesday, April 13, 2010

April 2010

In a few short months, we will be moved into our new home. There is still lots to do on the inside of the building. With some warmer weather, the outdoor projects can be completed.

1. Concrete set for drive up lanes.


2. Front entryway

Some of the continuing internal work includes open office areas, hallways, and stairwells. The windows will let sunlight in reducing the need to use electricity.

Thursday, March 4, 2010

1st Quarter 2010

In January the generator was delivered and installed.


With the colder weather and snow, the majority of the work moved inside. The offices were framed, sheet rock put up, windows installed, and walls sanded, primed and painted. The ceiling grid is being installed, and network cabling runs have started. There is still a lot of work to be done, but it's moving along according to the project schedule.

Wednesday, December 2, 2009

End of Year Progress

It has been awhile since our last post. The holidays have come and gone but work continues on the new buliding. The geothermal well drilling has been completed, and the system has been setup.


Skylights have been installed in the roof to reduce the amount of electricity needed upstairs.

The front entrance peak was installed in November.


The roof has been finished, complete with the shingles. Framing for the first floor has started, and the sheetrock walls are up on the second floor. The windows are currently being installed on the back side of the buliding.


Progress is moving along as we look towards a springtime move in date.

Monday, November 23, 2009

Geothermal Wells

As part of the Go Green initiative SFCU will be taking advantage of Geo-thermal energy to heat and cool the new building. This will decrease dependency on fossil fuels.


How it works?


In the winter, fluid circulating through the system's earth loop absorbs stored heat and carries it indoors. In the summer, the system reverses, pulling heat from the building, carrying through the earth loop and depositing it in the cooler earth.


Barney & Son Drilling has been busy over the last month drilling 28 wells that will tie into the closed loop system. Drilling will be completed by the end of November.